<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Office: Ah Asociados | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Fri, 20 Nov 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Refurbishment and Extension of San Juan de Dios Hospital / Ah Asociados]]>
      </title>
      <link>https://www.archdaily.com/873094/refurbishment-and-extension-of-san-juan-de-dios-hospital-ah-asociados</link>
      <pubDate>Sun, 18 Mar 2018 09:00:00 +0000</pubDate>
      <dc:creator>Rayen Sagredo</dc:creator>
      <category>
        <![CDATA[Extension]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/873094/refurbishment-and-extension-of-san-juan-de-dios-hospital-ah-asociados</guid>
      <description>
        <![CDATA[<p>This action has been carried out over a building designed by Víctor Eusa in 1935. It was completed in 1943. This modern landmark originally consisted of a main axis and two wings where the architectural program was developed. In the south of this comb figure hospitalization units were placed. In the north the obstetric unit and the chapel almost completed a third wing. The east-west axis ended against a cloister containing a residence for friars and several other support facilities surrounded by garden areas. The hospital was located outside the urban fabric of <a href="/tag/pamplona">Pamplona</a>, over a promontory overlooking the plain of the Arga River, the old town with the cathedral towers and the distant landscape.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5937/73f0/e58e/ce61/4200/0058/newsletter/HOSPITAL_SAN_JUAN_DE_DIOS-060.jpg?1496806375"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Urban Elevator in Echavaoiz  / Ah Asociados]]>
      </title>
      <link>https://www.archdaily.com/484386/urban-elevator-in-echavaoiz-ah-asociados</link>
      <pubDate>Mon, 10 Mar 2014 01:00:00 +0000</pubDate>
      <dc:creator>Fernanda Castro</dc:creator>
      <category>
        <![CDATA[Pedestrian bridge]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/484386/urban-elevator-in-echavaoiz-ah-asociados</guid>
      <description>
        <![CDATA[<p> This project emerge from an R+D+I study on Pedestrian Mobility in “Echavacoiz Norte”, commissioned by the City Council of <a href="/tag/pamplona">Pamplona</a> to the Innovation Department of <strong>ah asociados</strong>. In this research, three critical areas with historical accessibility and urban integration problems were detected and could be solved by implementing mechanical systems. </p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/531a/1a8d/c07a/802c/2700/0261/large_jpg/PORTADA.jpg?1394219637"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Etxezabala Office Building / AH Asociados]]>
      </title>
      <link>https://www.archdaily.com/246754/etxezabala-office-building-ah-asociados</link>
      <pubDate>Mon, 25 Jun 2012 00:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Government]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/246754/etxezabala-office-building-ah-asociados</guid>
      <description>
        <![CDATA[<p>The project comes up from the need of the Town Hall to concentrate the different administrative areas to facilitate working and municipal management. As a consequence, it has been decided to rehabilitate three annexed buildings in the old quarter of the city and transform them into an administrative whole.  Thus, the current Town Hall (the Portu House) conserves its institutional character; the Municipal Market maintains its current use in the ground floor, while the first floor could be used for cultural or institutional purposes and, in the end, there is the Etxezabala building, the one that will accommodate the different administrative areas required. This building is covered by a basic grade of protection as a cultural heritage. When it set on fire, it was necessary to change completely the project, but not the main intentions and strategies. These were flexibility and respect for the previous image of the building. The new building has the main staircase in the same place as the well was situated before. This staircase has been conceived as a light object unfolded across the space. Therefore, the pre-existing space is reproduced in a conceptual way and is showered by the light of the south, which is spread to the neighbouring areas where the lift has been located. From a functional point of view, the idea is to dispose all the elements of vertical communication, installations and access to the different floors next to the market. Thus, it is possible to simplify the access from the first floor of the market to the different areas of Etxezabala building and the distribution of the required installation piping.  Another important feature that helps to understand the proposal is the search of best flexibility. Once communications and common utility ducts have been disposed at the south extreme limiting with the market, a series of fixed areas for services are disposed repeatedly in each floor of the east extreme. These areas are the archives, toilets and a room that accommodates different auxiliary uses in relation to floors. The plumbing installation piping passes as well by the east extreme through an air space of adequate dimensions. The rest of the floor is used for disposing the different working areas. The main offices and meeting rooms are place in the north extreme of the floor in such a way that all of them are receiving natural lightning. These offices are separated by mobile partitions so that future changes may be arranged. The rest of the surface is available for posts that do not require offices, as well as the posts for customer support. All of them receive natural lightning through the gaps disposed at the west façade in the first, second and third floor. As an exception to this scheme, the ground floor presents in its north extreme (facing to the Calle Mayor) a double glass as a double skin that unfolds to give place to the access gate of the building from the Calle Mayor. In addition, a double desk to attend customers is placed in this level. In the central area of these desks there is an empty area reserved for waiting rooms. At last, the basement is designed as a polyvalent area where there are multi-purposed rooms, storage dependencies and an office area. The program required for this new building includes three administrative departments: Secretary, Economic Services and Social Affairs. In the ground floor there are several departments, such as Customer Service, Economic Services and Secretary. Each of them has a desk and prepared areas for personalized attention. The Customer Service area can be separated of the communications group by a door out of the opening hours of the service. In the end, in this floor there are two archives, one for each department (Secretary and Economic Services). In the first floor there are the Secretary services. The offices area has been completed with a meeting room and an additional room for IT Managers next to the server room. This floor is very important because at this height there is the access to the first floor of the municipal market and, therefore, the connexion with Portu House. So, both first floors (Etxezabala building and municipal market) share the same height. In addition, with this operation not only the pass through these two buildings is facilitated, but also the pass of the installation group piping. In the second floor there are the Economic Services. In addition, in case any enlargement of the Social Affairs Department took place, there is also a meeting room that has been prepared for this and for the use of the personal of this department. In the third floor the location of Social Affairs has been planned according to the number of offices required for this service. Therefore, in this floor the offices are arranged in an ‘L’ occupying the north and east sides. The waiting areas planned previously in each floor are defined here due to the privacy requirements defined by the department. This floor adds a customer service desk in front of the opened work area. Some fixed services pieces are proposed and repeated in every floor, as explained before. In this way, each administrative area includes toilettes, archives, an installation room and reprography. In the attic there is an additional space for installations and maintenance.  In relation to the image of the building, it is very significant the fact that the materials and gap layout of the previous building has been reproduced. At the same time, the volumetric and alienation to the Calle Mayor has also been maintained.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/4fe2/14d2/28ba/0d39/7f00/0007/newsletter/stringio.jpg?1414518302"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Architecture Studio in Cizur Menor / AH Asociados]]>
      </title>
      <link>https://www.archdaily.com/27899/architecture-studio-in-cizur-menor-ah-asociados</link>
      <pubDate>Wed, 08 Jul 2009 00:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Adaptive reuse]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/27899/architecture-studio-in-cizur-menor-ah-asociados</guid>
      <description>
        <![CDATA[<p>It was necessary to eliminate the divisions in order to obtain a free space on both floors: the offices and the architect's studio. Inside this free space, the existing structure and the built elements, which have been properly repaired and painted, are visible and add a timeless characteristic which contrasts with the new elements. The project has been planned as a total rehabilitation of the building preserving its original structure and elements. The inside and outside area of the building have been treated in different ways. The outside treatment respects the volumetric size of the building through the exclusive use of one unifying material. This treatment defines the new image of the building as clear and ordered thanks to the special disposition of the materials.</p> ]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5010/5f14/28ba/0d42/2200/1b35/newsletter/stringio.jpg?1414032352"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Tracasa Office Building / AH Asociados]]>
      </title>
      <link>https://www.archdaily.com/25555/tracasa-office-building-ah-asociados</link>
      <pubDate>Fri, 19 Jun 2009 01:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Institutional buildings]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/25555/tracasa-office-building-ah-asociados</guid>
      <description>
        <![CDATA[<p>The building has been planned as a well worked "pile" which rests on the terrain, adapting to its natural contours. It works from the precepts of superposition. It is placed on top of its supporting devices, and develops a layering, a coincidence and a meeting up with the natural and built environment.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5010/4f74/28ba/0d42/2200/17bc/newsletter/stringio.jpg?1361408183"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Arantzazu Renovation / AH Asociados]]>
      </title>
      <link>https://www.archdaily.com/24327/arantzazu-renovation-ah-asociados</link>
      <pubDate>Wed, 10 Jun 2009 00:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Renovation]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/24327/arantzazu-renovation-ah-asociados</guid>
      <description>
        <![CDATA[<p>The renovation of Arantzazu includes interventions that have been developed during the last four years to recover the environment around the Basilica of Arantzazu on the occasion of its fifth centenary.<br></p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5010/4325/28ba/0d42/2200/150e/newsletter/stringio.jpg?1361408089"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Civivox / AH Asociados]]>
      </title>
      <link>https://www.archdaily.com/23793/civivox-ah-asociados</link>
      <pubDate>Fri, 05 Jun 2009 00:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Town & City Hall]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/23793/civivox-ah-asociados</guid>
      <description>
        <![CDATA[<p>In the surroundings of the central park in Mendillorri, it has been proposed a building which keeps a relationship with the surrounding area, its views, and its functions. A type of monument which distances itself from people hasn't been sought out, but rather a constructed place which plays second fiddle to the park and the palace, to the lake and the inner landscape. For that reason the plots plateau has been altered as if it were a matter of a stone pavement in a public place which unfurls itself and rises up from below to gladly accept public resources. The effect of the folds create different spaces which are intertwined and multiply whilst taking advantage of the lands' unevenness. Thus the building is a square and wall facing towards the street, with its empty space and arcade facing towards the park.</p> ]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5010/3e5c/28ba/0d42/2200/13fc/newsletter/stringio.jpg?1414339100"></enclosure>
    </item>
  </channel>
</rss>
