<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>City: biel-bienne | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Fri, 20 Nov 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Switzerland Innovation Park / WALDRAP]]>
      </title>
      <link>https://www.archdaily.com/983004/switzerland-innovation-park-waldrap</link>
      <pubDate>Thu, 02 Jun 2022 12:00:00 +0000</pubDate>
      <dc:creator>Andreas Luco</dc:creator>
      <category>
        <![CDATA[Industrial Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/983004/switzerland-innovation-park-waldrap</guid>
      <description>
        <![CDATA[<p>The new building for Switzerland Innovation Park in Biel is the first of its kind in Switzerland, with five more locations and their new construction to follow. It provides infrastructure to develop innovative technology and products in collaboration with private corporations and research institutions, thus creating economic value and jobs. The new building acts as an ideas laboratory, talent magnet and innovation driver for the whole Seeland region and its economy. Innovation emerges where information is shared, goods are traded, assistance is provided, and inspiration is exchanged - all through social interactions. That makes a city the ideal environment to develop innovation. The challenge was to incorporate both the roughly given framework and the details, which were continuously adapted in a very dynamic process. The architects aim was to create a spatial framework for this agile business and technology environment that encourages openness and flexibility in thinking, planning, and acting.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/6298/c922/0281/9e4e/dd82/7a6c/newsletter/switzerland-innovation-park-waldrap_9.jpg?1654180149"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[School for Curative Pedagogy HPT Biel / bauzeit architekten]]>
      </title>
      <link>https://www.archdaily.com/891830/school-for-curative-pedagogy-hpt-biel-bauzeit-architekten</link>
      <pubDate>Mon, 23 Jul 2018 00:00:00 +0000</pubDate>
      <dc:creator>Daniel Tapia</dc:creator>
      <category>
        <![CDATA[Refurbishment]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/891830/school-for-curative-pedagogy-hpt-biel-bauzeit-architekten</guid>
      <description>
        <![CDATA[<p><strong>School for Curative Pedagogy HPT Biel, extension, and total refurbishment 2015-2017<br></strong>The school for curative pedagogy HPT Biel is a special school for children aged 4 to 18 years who need a special learning environment due to their mental and/or physical disabilities. With 116 children, it is one of the three largest special schools in the canton’s Bern. The school building from 1974 has been extended on three sides. The extensions are based on the existing basic grid of equilateral triangles.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5ac3/6ebe/f197/cca4/5f00/0077/newsletter/BA-BI-EPC-17-02-08.jpg?1522757302"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[School for Curative Pedagogy HPT Biel / bauzeit architekten]]>
      </title>
      <link>https://www.archdaily.com/891929/school-for-curative-pedagogy-hpt-biel-bauzeit-architekten</link>
      <pubDate>Sat, 07 Apr 2018 05:00:00 +0000</pubDate>
      <dc:creator>Pilar Caballero</dc:creator>
      <category>
        <![CDATA[Refurbishment]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/891929/school-for-curative-pedagogy-hpt-biel-bauzeit-architekten</guid>
      <description>
        <![CDATA[<p><strong>School for Curative Pedagogy HPT Biel, extension and total refurbishment 2015-2017 </strong></p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5ac4/e19c/f197/ccbb/7000/02d9/newsletter/BA-BI-EPC-17-03-01.jpg?1522852244"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[New Office and Production building / Burckhardt]]>
      </title>
      <link>https://www.archdaily.com/377306/new-office-and-production-building-burckhardt-partner</link>
      <pubDate>Mon, 27 May 2013 01:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[Offices]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/377306/new-office-and-production-building-burckhardt-partner</guid>
      <description>
        <![CDATA[<p>The decision to bring the various sites together under one roof paved the way for the new Sputnik Engineering AG production and administration building in Biel. Burckhardt+Partner AG won the invited competition in the year 2009.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/519e/a1a3/b3fc/4b10/be00/0008/newsletter/753275_Sputnik_Biel_CP_1211_008_HS_outside_mod.jpg?1369350558"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Children's Clinic Wildermeth / bauzeit architekten]]>
      </title>
      <link>https://www.archdaily.com/141410/childrens-clinic-wildermeth-bauzeit-architekten</link>
      <pubDate>Thu, 09 Jun 2011 00:00:00 +0000</pubDate>
      <dc:creator>Megan Jett</dc:creator>
      <category>
        <![CDATA[clinic]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/141410/childrens-clinic-wildermeth-bauzeit-architekten</guid>
      <description>
        <![CDATA[<p>The children’s clinic ‘Wildermeth’, in the early 2000s, decided to join the hospital complex Biel. This is envisaged to improve its services and simultaneously reduce operating costs through synergies with the existing hospital. The shape of the building is the result of the need for a maximum constructible development in the front perimeter set to have the most number of locals in contact with the outside.</p> ]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5014/989a/28ba/0d39/5000/07e3/newsletter/stringio.jpg?1419137269"></enclosure>
    </item>
  </channel>
</rss>
