BROWSE ALL FROM THIS FIRM HERE

Gablepack / AND

21:00 - 28 April, 2015
© Kyungsub Shin
© Kyungsub Shin

© Kyungsub Shin © Kyungsub Shin © Kyungsub Shin © Kyungsub Shin +23

VOIDWALL / AND

01:00 - 30 July, 2014
© Kyungsub Shin
© Kyungsub Shin

© Kyungsub Shin © Kyungsub Shin © Kyungsub Shin © Kyungsub Shin +16

Aggrenad / AND

01:00 - 8 February, 2013
© Kim, Yong Gwan
© Kim, Yong Gwan
  • Architects

  • Location

    Geojesi, Korea
  • Construction

    Kim, Dong Shik
  • Structure

    RC
  • Site Area

    433.00m2
  • Gross Floor Area

    198.55m2
  • Area

    121.26 sqm
  • Photographs

    Kim, Yong Gwan

© Kim, Yong Gwan © Kim, Yong Gwan © Kim, Yong Gwan © Kim, Yong Gwan +9

Skinspace / AND

01:00 - 24 April, 2012
© Kim Yong Gwan
© Kim Yong Gwan
  • Architects

  • Location

    Seohoori, Seojongmyun, Yangpyeonggun, Gyeonggido, Korea
  • Structure

    RC
  • Construction Area

    112.62 sqm
  • Gross Area

    130.60 sqm
  • Project Year

    2010
  • Photographs

    Kim Yong Gwan

© Kim Yong Gwan © Kim Yong Gwan © Kim Yong Gwan © Kim Yong Gwan +14

Villa Topoject / AND

01:00 - 22 August, 2011
© Byun
© Byun
  • Architects

  • Location

    Gyeonggi-do, South Korea
  • Architects

    Architecture of Novel Differentiation (AND)
  • Area

    199.0 sqm
  • Project Year

    2010
  • Photographs

    Byun

© Byun © Byun © Byun © Byun +16