T3 / Michael Green Architecture + DLR Group

T3 / Michael Green Architecture + 	DLR Group - Windows, Brick, FacadeT3 / Michael Green Architecture + 	DLR Group - Windows, FacadeT3 / Michael Green Architecture + 	DLR Group - Windows, FacadeT3 / Michael Green Architecture + 	DLR Group - CityscapeT3 / Michael Green Architecture + 	DLR Group - More Images+ 8

More SpecsLess Specs
T3 / Michael Green Architecture + 	DLR Group - Windows, Facade
© Ema Peter

Text description provided by the architects. When Hines approached MGA with this exciting project they envisioned T3 as a unique model of new-office building; an opportunity to offer a modern interpretation of the robust character of historic wood, brick, stone, and steel buildings with the additional benefits of state of the art amenities, environmental performance, and technical capability.

T3 / Michael Green Architecture + 	DLR Group - Windows, Facade
© Ema Peter

The project is an investment in both the past and future of Minneapolis and in the Warehouse District’s rich history. The design objective for T3 was to build on the character of the past with a modern perspective. As businesses look to new competitive models for attracting staff, the goal for T3 was to provide a warm and inviting environment that would attract and retain employers and employees.

T3 / Michael Green Architecture + 	DLR Group - Cityscape
© Ema Peter

T3, which stands for ‘Timber, Technology, Transit’, offers 224,000 square feet of office and retail space. Over 3,600 cubic meters of exposed mass timber columns, beams, and floor slabs recall the heavy timber construction of the building’s predecessors. T3’s modern technological approach uses engineered wood components (chiefly glulam and nail laminated timber) for the roof, floors, columns and beams, and furniture. A significant amount of the lumber used to fabricate the NLT comes from trees killed by the mountain pine beetle. These modern materials bring the warmth and beauty of wood to the interior, and promote a healthy indoor environment for occupants.

T3 / Michael Green Architecture + 	DLR Group - Facade
© Ema Peter

As a result of its wood structure, T3 was erected at a speed exceeding conventional steel-framed or concrete buildings. In less than 10 weeks, 180,000 square feet of timber framing went up, averaging 30,000 square feet of floor area installed per week. It is also lighter than comparable steel or concrete structures, reducing the depth and extent of excavation and foundations. Additionally, the embodied carbon in the building’s wood structural system is lower than that found in conventional buildings found throughout most of downtown Minneapolis and the North Loop.

T3 / Michael Green Architecture + 	DLR Group - Image 12 of 13
Structural Diagram

The building’s aesthetic success can also be attributed to the mass timber construction. Candice Nichol, MGA Associate and T3 Project Lead, says “the texture of the exposed NLT is quite beautiful. The small imperfections in the lumber and slight variation in color of the mountain pine beetle wood only add to the warmth and character of the new space.”  Extensive exterior glazing at every level as well as views into the ground level social workspace with wood furniture, booths, and a feature stair, allow the public to experience the building.

T3 / Michael Green Architecture + 	DLR Group - Windows, Facade
© Ema Peter

The use of wood is celebrated throughout the building. “The entire timber structure of T3 was intentionally left exposed and illuminated with interior lighting directed up to the ceiling,” Nichol says. At night, “the illuminated wood will glow through the exterior openings.”

T3 / Michael Green Architecture + 	DLR Group - Facade
© Ema Peter

T3 is currently the largest completed mass timber building in the U.S. With changing building codes throughout North America, tall wood buildings will become more common. A pioneer in this building type, T3 has broken new ground and is perhaps a prototype for future commercial mass timber buildings.

T3 / Michael Green Architecture + 	DLR Group - Image 13 of 13
Exploded Wall Section

Product Description. Nail-laminated assemblies have been used for more than a century, particularly in warehouses where solid, sturdy floors were required. It is now being recognized again as a valid alternative to concrete slab and steel in commercial and institutional buildings, and residential buildings in which it is often exposed to create a unique aesthetic. 

Project gallery

See allShow less

Project location

Address:Minneapolis, MN, United States

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "T3 / Michael Green Architecture + DLR Group" 06 Jan 2017. ArchDaily. Accessed . <https://www.archdaily.com/802831/t3-michael-green-architecture> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.