Support on the -- Click here to nominate us for Best Online Magazine!Close
Visit our Products section to learn more about architectural products.

Franzen house / SchappacherWhite

By Amber P — Filed under: Houses , Selected , , ,
 

Architects: SchappacherWhite Ltd. & Gregory Cranford – Brennan Beer Gorman Architects
Location: New London, Connecticut, USA
Principal: Steve Schappacher
Design/Restoration Architect: Gregory Cranford
Interiors: SchappacherWhite Ltd.
Construction: Mixed Structure
Project Year: 2005
Photographs: SchappacherWhite Ltd.

Hugging the shores of the Long Island Sound, Ulrich Franzen’s ‘Castle House’ typifies the school of East Coast modernism established by the generation of post-Bauhaus architects at work in the U.S. in the 1950s and 1960s when personal expression and dramatic effects were no longer illicit.  This house was built on a historic rock outcropping adjacent to an eighteenth century landmark lighthouse facing the sea.  This modern classic, almost a fallen victim to total demolition, has undergone a complete renovation and expansion by SchappacherWhite Ltd. and Brennan Beer Gorman/Architects (BBG), that honors Franzen’s original design intent while satisfying the needs of a 21st century family.

original plan

new project plan

Ulrich Franzen’s vision for the house, which was completed in 1964, represents the forefront of early 1960’s residential design.  The home’s signature element is its dramatic free floating glass living room pavilion with cantilevered paraboloid vaults and flanking service wings.  The pavilion’s cypress butterfly ceiling has been restored and all new furnishings selected for the home, including a 14′ custom designed Nakashima dining table.

To remedy a flaw in the original design that sought to direct views away from the water, the architects introduced two new sets of 9′ tall sliding glass panels into the central building, replacing solid walls.  The new windows now provide stunning vistas across the landscaped pool area and onto the Sound beyond from both the master bedroom and kitchen/family room.  The bedroom wing was extended to accommodate the size of the client’s family and a staircase added to a lower level playroom.

The existing kitchen has been expanded and includes a family dining area, creating a fluid and open plan that matches the new owner’s lifestyle.  Original details were carefully studied and retained in the Modern spirit of the new kitchen, which features the reuse of the original material palette of birdseye maple casework, white lacquer cabinets and luminous white marble countertops.

Originally the waterside site was treated as a rough rocky outcropping.  New landscape design has softened the house’s setting, offering a reconceived approach to the water, as well as the public and private sides of the home.  Since the lot is semi-surround by water and limited in size, it was determined that a variety of places to occupy and sit should be provided for.  For example, the reconstructed circular dining platform hung above the waters is just a short distance from the renovated kitchen, but offers a unique and removed experience.

It was not an easy exercise matching the rigor of the existing scheme. The more it was studied, the more the architects became enthralled with the intricate and complex geometries of the details.  Every line in the house was considered, every detail obsessed over, so that the spirit of the house, even in the areas completely redesigned, remain true to the original.

Franzen’s houses have an important place in our country’s architectural history.  Your readers are attuned to the significance of homes such as this and would surely be interested to see how contemporary residents are preserving a piece of history while living very much in the present.

 

5 comments »

Terry Glenn Phipps says:

Would it not seem that an important architectural house with an equally sensitive restoration and studied expansion deserves to be documented in a better way? It is a baffling challenge trying to understand why professionals, particularly in the field of restoration and preservation, feel that it is appropriate to present their work to the world using cellphone photography. The house, Ulrich Franzen, the owners, and your own studio deserve better than that.

Terry Glenn Phipps

 
# April 30, 2009 at 03:53
francis says:

What a site, WOW! The house is so lucky exist there.

 
# April 30, 2009 at 07:45
Bo Lucky says:

Nice house and it seems that Gregory Cranford did a good and sensible rehabilitation.

 
# April 30, 2009 at 08:55
Ceno says:

this house looks really comfortable

 
# May 1, 2009 at 02:11
Lulu says:

Beautiful house. Given the accessability of the photos it seems as if the architechts were gognizant of keeping with Franzen’s concept whilst giving it a “new modern” feel. Well done!

 
# May 4, 2009 at 13:35

Leave a Reply »

Want to have your own avatar? Get yours at Gravatar.

Latest Comments »

What basic rules of the eye perspective?[+]
I liked much this project… It’s true that...[+]
This is certainly a mixture of styles but somehow it feels quite...[+]
What an innovative, unique yet modest project this...[+]
you are a true knower of contemporary architecture, i...[+]
i actually quite like it! because the material was kept...[+]
l.a. w.e.a f.e.a[+]
Why waste space by not giving it to people?[+]
At least you would add some...[+]
A linear plan that works. Access to full...[+]
i’m with mr.cheap on this one, this largely reminds me of a much less...[+]
Can somebody get into the web page? 406 Not...[+]

Browse by category »

Our partners »

Browse by date »

Friends »

Proudly hosted at »