Emidio Navarro Secondary School / Oficina Ideias em Linha

© FG+SG – Fernando Guerra, Sergio Guerra

Architects: José Laranjeira
Location: Almada,
Client: Parque Escolar, EPE
Project team: Doriana Reino, Ana Abrantes, Tiago Coelho, Manuel Banazol, João Pedro Louro
Project area: 10,000 sqm
Project year: 2008 – 2010
Photographs: FG+SG – Fernando Guerra, Sergio Guerra, Francisco Nogueira

© Francisco Nogueira

Built during the fifties in Almada, the Emídio Navarro Secondary School (1956-1958) was initially performing as a Technical School (Escola Industrial e Comercial de Almada), and later converted into a Secondary School.

As Secondary School, the Escola Secundária Emídio Navarro (ESEN) was recently included in a modernization program fund that financed the school’s functional revamp and expansion regarding its optimal performance.

© FG+SG – Fernando Guerra, Sergio Guerra

The original structural was respected as well as the internal accessibility scheme, which keeps the original vertical access columns and a centralized corridor, articulating two rows of classrooms on both wings of the existant building, now regarded as Unit A.

The ESEN material components, constructive and structural systems were also respected during the inner functional reorganization process, which implied vertical access columns insulation and structural reinforcement.

© FG+SG – Fernando Guerra, Sergio Guerra

Unit A will house the classroom areas and main complementary functions, whose reorganization will allow full optimization and an overall performance enhancement.

Through the northern entrance and along Unit A’s first floor are displayed the management and the school supportive functions, as well as the library, in direct contact with the urban environment.

site plan

The gymnasium and sports building (Unit B) was also kept, and the existing canteen was replaced by the gymnasium complementary spaces such as restrooms and health resort.

The old workshop functions are now aggregated in the new building (Unit C) distributed along three levels: electric, electronic and mechanical areas on the ground floor, labs and computation technical rooms along the first floor and teacher´s offices and auditorium on the upper floor.

© FG+SG – Fernando Guerra, Sergio Guerra

A second new building (Unit D) is proposed housing an indoor sports area on its upper level , the new canteen, the overall social and recreational areas on the ground floor.

The outdoor areas were extensively remodeled and reorganized in order to accommodate recreational, convivial / shaded, and sports areas.

View this project in Google Maps

* Location to be used only as a reference. It could indicate city/country but not exact address.
Cite: "Emidio Navarro Secondary School / Oficina Ideias em Linha" 20 Apr 2011. ArchDaily. Accessed 21 Dec 2014. <http://www.archdaily.com/?p=129087>